Phases of work

The phases of work

 

Follow the different phases of work below…

Methods of preparing surfacesProduced resimarmoStairs terracesApplication resimarmoComplementary informations

These are the phases of work RESIMARMO®. You have seen that it is quite possible to do it yourself ! It takes just a little care and a little patience in the different phases of laying.

The substrate must be cohesive and free from dust. It must also be stable and must not “work” after the installation of RESIMARMO®. It is imperative to saturate it with a primer (the anhydride screeds are for example very absorbent). Otherwise, the resin may be absorbed by the support and therefore not be available to bond the marble aggregates. Smooth substrates such as tiles (yes, it is possible) or floor resins (also possible) must be sanded beforehand. Check that all the tiles are still adhering by striking them with a metallic object. Wooden floors (yes, it is still possible) must be perfectly stabilized. The substrate must be sound, dry and free from any moisture. The decking floors must be waterproofed. Outside the profiles must be fixed so as to allow the water to pass from below. If the support does not have a slope or counter-slope it must be drilled to remove the water retention.

In a bathroom a liquid screed must be applied to protect the support from possible water damage. In addition, the marble aggregate perfectly matches the reliefs: it is the ideal floor covering for your renovation of floors.

 

What do you think ?

Do you feel able to do the laying of your flooring yourself ?

If you answer yes, then you will save your money.

You will have for much cheaper, a sublime flooring!

 

Go here to order your RESIMARMO® exterior flooring.

 

 

 

Logo-RESIMARMO